4.3 Set of test cases and results
* 4.4 Procedure for generating, maintaining and modifying the system
4.5 Specification of installation procedure
5. STANDARDS AND CONVENTIONS
5.1 Applicable industry and international standards
5.2 Standards and conventions to be used in house
ADDENDUM — SOFTWARE COST ELEMENTS
NORMAL SEMINORMAL
Training Duplication
Personnel turnover Waiting for Test time
Design Waiting for return
Functional description Programmer fatigue (irregular schedules,
Review — Conceptual lack of direction)
Coding Communications misunderstanding
Testing — Quality control Deterioration
Review — Implementation Design inflexibility for change
Machine time — Test
Technical documentation
User documentation
Supplies — Paper, cards, tapes
Input Data Preparation
Rework and false starts
Failure — Hardware
— Basic Software
— Interaction
Testing — Quality assurance
Terminal and line costs